About Project
KLD delivered two sets of containerized steam systems, four sets of H-1200 hot water generator systems, one set of central integrated system and one set of auxiliary integrated systems. The hospital did not set up a boiler room in the early stage, heating and steam applications were greatly troubled, and then the KLD Containerized heating system was selected. 8 sets of integrated steam generators successfully solved the difficulties of hospital. Moreover, KLD did not raise the price when the customer was stuck in the trouble. KLD realized its promise of integrity management, which was praised by users.